LMV RANGE EARTH LINK FITTING DETAILS |
|
|
|
|
SHELL SIZE 1 AND SHELL SIZE 2
|
|
| Earth link assembly details
and fitting instructions 1: Fit tag into solder bucket of earth terminal (E) 2: Ensure rim of earth link is seated into shell recess. 3: Solder brown lead into live terminal (L) 4: Solder blue lead into neutral terminal (N) 5: Solder green/yellow lead and earth link tag into earth terminal (E) 6: Slide correctly orientated retaining gland firmly on to rim of earth link, assemble and tighten. IMPORTANT Maintain pressure on the outlet to ensure that the castellations on the outlet and the connector are located before tightening the outlet nut. |
|
| USING MULTICORE CABLE
TOTALLY UNSCREENED |
|
|
|
|
|
|
|
|
|
|