| LMF/LMG WIRING INSTRUCTIONS MULTICORE CABLES WITH INNER COLLECTIVE SCREEN ONLY |
|
|
1)
Strip outer sheath and braid. Thread on union nut, thrust ring (or packing piece), union gasket (see note), compression ring and cable sleeve. Comb out metal braid, fold back over sheath and tape down. Strip insulation from conductors and tin dip. Thread on outlet nut, outlet, and outlet gasket. Fit insulating sleeves to each conductor. NOTE: Union gasket requires to be a close fit to cable sheath. Synthetic rubber sleeve/s to be fitted to achieve a satisfactory fit. |
|
|
|
|
|
2)
Solder conductors to connector contacts and slide insulating sleeves over soldered joints. Position outlet gasket and outlet at rear of connector and secure with outlet nut. Slide cable sleeve into neck of outlet. |
![]() |
| 3)
Remove tape from metal braid and fan out 900 to cable. Position compression ring on end of outer sheath trapping braid between outlet and compressions ring. Slide forward union gasket and thrust ring to rear of compression ring. Trim off braid, to rear face of compression ring and screw union nut onto outlet. |
![]() |
|
|
|