LMF/LMG
WIRING INSTRUCTIONS MULTICORE CABLE WITH OUTER COLLECTIVE
SCREEN
1) Strip back braid and sheath.
Strip insulation from conductors and tin dip.
Thread on union nut and outer ferrule.
Thread on inner ferrule and position under braid.
Fit insulating sleeves
to each conductor.
2)
Force outer ferrule over inner ferrule
and braid.
Trim off any braid which may protrude between ferrule flanges.
Compress the braid back down cable.
Thread on sealing ring, outlet nut, outlet and outlet gasket.
Solder conductors to connector contacts and slide insulation sleeves
over joints.
3)
Position outlet gasket and outlet at rear of connector and secure with
outlet nut.
Slide sealing ring into neck of outlet.
Pull forward ferrules and braid. secure with union nut.